Change the font size

Search




Contacts:
Å-mail: news@rosatom.ru
Phone: +7 (495) 545-08-88

The specialists of Mountain chemical integrated plant stopped the reactor ADE–2



10.05.2006 // Press service of Krasnoyarsk regional information centre

The stop of reactor ADE-2 is made for transshipment of nuclear fuel and maintenance for bettering the safety and reliability of the underground reactor operation.

Nuclear reactor ADE-2 was put into operation in 1964. It is the main source of heat for Zheleznogorsk city. During the prophylactic maintenance of energy reactor ADE-2 the heat supply of Zheleznogorsk city is performed by the boiler rooms of Mountain chemical integrated plant The fuel of these boilers is coal and boiler oil. The boiler rooms have enough supply of the fuel.

All the planned and prophylactic maintenance on the reactor stop, transshipment of fuel and technical support are held by the specialists of reactor operation at Mountain chemical integrated plant in accordance with approved regulations. Such planned and prophylactic work at nuclear reactor ADE-2 are held by the specialists several times a year. The specialists of reactor operation of Mountain chemical integrated plant plan to put energy reactor back into operation and reach the working capacity in 20 days after its complete stop. The stop of energy reactor ADE-2 at Mountain chemical integrated plant was held without any incidents.


© 2000—2008 Press center of nuclear energy and industry.
Developed by Nile Studio