Change the font size

Search




Contacts:
Å-mail: news@rosatom.ru

News



18 May 2006 year

“TVEL” corporation took part in the 3rd economical forum in Krasnoyarsk

12–13 May “TVEL” corporation took part in the 3rd economical forum “The development of the East of Russia” in Krasnoyarsk. More

18 May 2006 year

About Beloyarsk NPP operation on 8 – 14 May 2006

Energy unit BN-600 is stopped, because of the planned equipment inspection. The restart of energy unit is to be on 21 May 2006. More

17 May 2006 year

Balakovo NPP is the best Russian NPP of 2005

As a result of a traditional annual contest of “Rosenergoatom” concern Balakovo NPP was named “The best NPP of 2005”. More

16 May 2006 year

The new deputy of the head of Rosatom is appointed

In accordance with the decree of The Government of Russian Federation ¹675-p Malyshev Andrey Borisovich was appointed a new deputy of the head of Federal Agency of nuclear energy. He was a head of Federal Service of ecological, technological and nuclear supervision. More

16 May 2006 year

Successful Tests of fuel pins with modern tablets

On the 10th of May in OAO “Machinery building plant” (Electrostal, Moscow region) there was a successful test of fuel pins for modern heating units of WWER-1000. The tablets in heating units had no hole in its centre. More

11 May 2006 year

MSZ put a new galvanic line into operation

In the beginning of May OAO “Machinery producing plant” (Electrostal, Moscow region) a new galvanic line was put into operation. More

11 May 2006 year

Putin calls out to reform nuclear industry

The President of Russia V.V.Putin paid special attention to the development of nuclear industry, while delivering an annual address to the Federal Assembly on 10 May 2006. More

10 May 2006 year

The specialists of Mountain chemical integrated plant stopped the reactor ADE–2

The stop of reactor ADE-2 is made for transshipment of nuclear fuel and maintenance for bettering the safety and reliability of the underground reactor operation. More

06 May 2006 year

The 1st energy unit of Kalinin NPP was stopped

On the 5th of May 2006 at 3 PM the 1st energy unit of Kalinin Nuclear Plant was stopped in accordance with the request of “Rosenergoatom” administration for the sake of flange coupling defect correction at metering system. More


© 2000—2008 Press center of nuclear energy and industry.
Developed by Nile Studio