Change the font size
Contacts:
Å-mail: news@rosatom.ru
Phone: +7 (495) 545-08-88
24.12.2007 // Press service of Rosenergoatom Concern
Turbine generator 3 of Kursk NPP has been restarted
The turbine generator was stopped on Sunday 6:46 PM because of a problem in the generator feed system.
The capacity of unit 2 was halved to 500MW.
The problem was removed the same day and the turbine generator was restarted at 11:27 PM.
Presently, Kursk NPP is operating safely. The radiation background at the plant and in the nearby area is within norm.