Change the font size

Search




Contacts:
Å-mail: news@rosatom.ru
Phone: +7 (495) 545-08-88

About the operation of Beloyarskaya NPP Dec 11–17



19.12.2006 // Information Center of Beloyarskaya NPP

The BN-600 operated at nominal capacity

On Dec 17, 2006, the BN-600 unit of Beloyarskaya NPP fulfilled the annual production plan.

No changes in the radiation background or deviations from the safety norms were registered during the week. The emission of neutral gases was 0.01% of the admissible level.

The radiation situation in the town of Zarechny and the nearby area was within norm.

The radiation background in the town was no more than 5.0 micro roentgen/hour (0.05 micro sievert/hour), while the natural radiation background in the territory of Russia is 4–20 micro roentgen/hour (0.04–0.2 micro sievert/hour).

To remind, for information about the operation of Beloyarskaya NPP and the radiation situation in the area call (34377) 3–61–00 or contact the Information Center of the NPP (34377) 3–63–42 or bakanova@bnpp.x-atom.ru


© 2000—2008 Press center of nuclear energy and industry.
Developed by Nile Studio