06.04.2007 // Press service of Rosenergoatom
In Mar 2007 Novovoronezh NPP produced 1.027bln KWh – 86.9% of the plan
The low production was due to the stoppage of the 5th unit on Mar 11–17 and the 4th unit on Mar 24–29 (see Mar 13 and Mar 22 reports).
The 3rd, 4th and 5th units are working according to the plan.
The capacity factor made up 75.4% with the plan being 86.7%.
No safety limits were exceeded.
The radiation emission was within controlled limits:
The average radiation background in the settlements of the 30km zone was within norm – 8–25 mR/h:
|
Index |
Neutral radioactive gases |
Iodine-131 |
|
1 |
2 |
3 |
|
Monthly emission in % of admissible level |
5.4 % |
4.3 % |
The average radiation background in the 30km zone
01.03.2007–31.03.2007
|
¹¹ |
Name of settlement |
Average monthly index (mR/h) |
|
1. |
Anoshkino |
8.1 |
|
2. |
Arkhangelskoye |
9.4 |
|
3. |
Boyevo |
11.4 |
|
4. |
Borschevo |
11.5 |
|
5. |
Kamenno-Verkhovka |
8.2 |
|
6. |
Kostenki |
9.3 |
|
7. |
Krugloye |
9.0 |
|
8. |
L.Rossosh |
8.4 |
|
9. |
Mastugino |
8.2 |
|
10. |
Novovoronezh |
9.8 |
|
11. |
Oskino |
10.4 |
|
12. |
Storozhevoye |
9.5 |
|
13. |
Yablochnoye |
10.9 |
|
14. |
Shilovo |
10.4 |
|
15. |
Voronezh |
12.0 |