Change the font size

Search




Contacts:
Å-mail: news@rosatom.ru
Phone: +7 (495) 545-08-88

Technical state of Smolensk NPP



09.04.2007 // Information and PR Center of Smolensk NPP

About the work of Smolensk NPP Apr 2–8 2007

The 1st and 3rd units were operating at a total capacity of 2025 MW without failure.

The 2nd unit is under repairs with some of its assembly channels being replaced.

On Apr 1–9 the plant issued 389mln KWh. Since the beginning of this year SNPP has produced 4.824bln KWh, which is 43mln more than planned.

The radiation background at the plant and in the nearby area is within norm.


© 2000—2008 Press center of nuclear energy and industry.
Developed by Nile Studio