Change the font size
Contacts:
Å-mail: news@rosatom.ru
Phone: +7 (495) 545-08-88
22.05.2007 // Information Center of Beloyarsk NPP
May 14–20 2007 the BN-600 unit of Beloyarsk NPP operated at a capacity of 400 MW
One of the 200 MW turbine generators is being modernized.
No safety limits were exceeded. The emission of neutral radioactive gases made up 0.01% of the admissible level.
The radiation situation in Zarechny and in the 30 km zone was within norm. The radiation background in the town was 5.5 mR/h (0.055 mSv/h).
For round-the-clock information about the work of Beloyarsk NPP and the radiation situation in the area call (34377) 3–61–00.
You may also call the Information Center of the plant: (34377) 3–63–42 or write to bakanova@bnpp.x-atom.ru