Change the font size
Contacts:
Å-mail: news@rosatom.ru
Phone: +7 (495) 545-08-88
17.09.2007 // Information Department of Kalinin NPP
Unit 3 of Kalinin NPP was stopped for repairs on Sept 17 7:00 AM
In the next three days the personnel are to remove the problems detected in the equipment of the second circuit.
Unit 2 is operating at full capacity. Unit 1 is under mid-term repairs.
The radiation background at Kalinin NPP and in the nearby area is within norm.