16.11.2007 // Information Department of Leningrad NPP
Since its launch Leningrad NPP has generated 733.492bln KWh
Since the beginning of this year the plant has generated 21.233bln KWh with the annual electricity production plan being 24.210bln KWh. In Nov the plant has produced 1.096bln KWh.
Presently, units 1, 2 and 4 are operating safely at a total capacity of 3055MW.
The plant is operating stably.
Unit 3 has been under repair for 118 days already. Presently, the personnel are repairing the defects detected during the supersonic testing of the welded joints of DU-300 pipelines, repairing the valves of DU-800 pipelines, generators 5 and 6 and installing ventilation systems.
The radiation situation at Leningrad NPP, in Sosnovy Bor and its suburbs is within norm.
The maximum radiation background in the area controlled by the plant’s automated radiation control system is 14 mSvh, which is normal for the region.