Change the font size

Search




Contacts:
Å-mail: news@rosatom.ru
Phone: +7 (495) 545-08-88

Novovoronezh NPP: Jan 13–19 2008



21.01.2008 // Information Department of Novovoronezh NPP

About the work of Novovoronezh NPP Jan 13–19 2008

Units 3, 4 and 5 operated at full capacity.

The radiation background at the plant was within norm.

The averaged gamma background at the plant, in Novovoronezh and at the 20 points monitored by the Automated Radiation Control System sensors installed in 13 settlements of the 30-km zone was within 7.0–11.8 mRh, which within the limits typical of the Central European part of Russia (8–25 mRh).


© 2000—2008 Press center of nuclear energy and industry.
Developed by Nile Studio