Change the font size

Search




Contacts:
Å-mail: news@rosatom.ru
Phone: +7 (495) 545-08-88

Leningrad NPP today



28.04.2008 // Information Department of Leningrad NPP

Leningrad NPP on Apr 28 2008

Presently, units 1, 2 and 4 are operating at a total capacity of 3,100MW.

Unit 3 is being overhauled. The maintenance campaign is near completion.

The radiation situation at Leningrad NPP, in Sosnovy Bor and its suburbs is within norm, which proves that the plant is safe.

According to the automated radiation control system of Leningrad NPP, the radiation background at the plant and in Sosnovy Bor is 0.14mSv/h.

For detailed information about the radiation situation at Leningrad NPP and in its buffer and monitoring zones see www.rosenergoatom.ru or www.lnpp.ru.


© 2000—2008 Press center of nuclear energy and industry.
Developed by Nile Studio